LIGNUM – Holzwirtschaft Schweiz | Economie suisse du bois | Economia svizzera del legno
Mühlebachstrasse 8 | 8008 Zürich | Tel. 044 267 47 77 | Fax 044 267 47 87 | info@lignum.ch

> Printversion

Components

Construction assembly F0154

Lignum ID-№
F0154
Catalog number
F.1.01.PB18
Source of construction assembly
PB 18-002112-PR01 PB 18-F01-04-de-01, Year 2018
Base structure
Ribs
Sheathing
Sheathed left & rightside
Paneling
Without covering
Reference fire protection
VKF Brandschutzanwendung Nr. 15421
Construction height
551 mm
Weight
277 kg/m2
U-value
≈ 0.153 W/m2K
GWP
0.00 kg CO2-eq/m2
Type sound insulation
Measurement
Flat roof / shed roof consisting of a basic construction of ribs without cavity insulation in the supporting structure. Sheathed left & rightside, leftside single sheathed rightside single sheathed. Without covering with insulation on top of the sub-floor.
Values of airborne sound insulation
Rw 64 dB
C -2 dB
Ctr -7 dB
Values of footfall sound insulation
Ln,w 35 dB
CI 5 dB
CI50-2500 dB

Graphic

Assembly

Layer Product Manufacturer Thickness [mm] Weight Width (b) Axial distance (e) KBOB ID-№ Production KBOB ID-№ Disposal

Values by frequency

Color Type 25 32 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000
Airborne sound (R) Measurement Ift Rosenheim 32 31 38 42 46 44 48 54 61 60 60 63 71 76 79 79 80 81 81 85 86
Calculation Lignum/Kühn and Blickle 7 7 7 15 23 30 36 39 46 52 58 64 71 77 82 88 93 99 105 110 110 110
Impact sound (Ln) Measurement Ift Rosenheim 59 59 55 54 46 40 34 30 29 31 30 29 28 23 17 13 12 8 7 7 7
Calculation Lignum/Kühn and Blickle 74 76 80 75 70 66 63 63 59 56 53 50 46 43 41 38 36 33 30 27 21 16

Airborne sound (R)

Loading...

Ecological indicators according to the KBOB life cycle assessment data in the construction sector KBOB / ecobau / IPB 2009/1:2022, Version 6
(For the life cycle phases production and disposal, excluding the construction phase (Modules A4, A5) and the use phase (Module B), especially replacement (Module B4) or amortization periods according to SIA 2032)

bSDD Properties
mm Indicators Modules
Values / m2
+
Environmental impact points (UBP)
141108
UBP'21/m2
A1-A3 + C1-C4
 
Environmental impact points from production (UBP_pro)
110144
UBP'21/m2
A1-A3
 
Environmental impact points from disposal (UBP_dis)
30984
UBP'21/m2
C1-C4
+
Total primary energy (PE_T)
1138.60
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy from production (PE_pro)
1120.90
kWh oil-eq/m2
A1-A3
 
Primary energy production, energetically consumed (PE_E_pro)
485.20
kWh oil-eq/m2
A1-A3
 
Primary energy production, materially bound (PE_M_pro)
636.40
kWh oil-eq/m2
A1-A3
 
Primary energy from disposal (PE_dis)
17.40
kWh oil-eq/m2
C1-C4
+
Renewable primary energy (PE_RT)
823.30
kWh oil-eq/m2
A1-A3 + C1-C4
 
Renewable primary energy from production (PE_RT_pro)
822.00
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from generation, energetically consumed (PE_RE_pro)
248.60
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from production, materially bound (PE_RM_pro)
572.70
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from disposal (PE_RT_dis)
1.00
kWh oil-eq/m2
C1-C4
+
Total use of non- renewable primary energy resources (PE_NRT)
316.00
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy not renewable from manufacturing (PE_NRT_pro)
299.40
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, energetically consumed (PE_NRE_pro)
236.00
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, materially bound (PE_NRM_pro)
63.60
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from disposal (PE_NRT_dis)
16.50
kWh oil-eq/m2
C1-C4
+
Total greenhouse gas emissions (GWP_total)
80.60
kg CO2/m2
A1-A3 + C1-C4
 
Greenhouse gas emissions from manufacturing (GWP_pro)
56.30
kg CO2/m2
A1-A3
 
Greenhouse gas emissions from waste disposal (GWP_dis)
24.40
kg CO2/m2
C1-C4
 
Biogenic carbon dioxide storage (bio-C x 44/12 = bio-CO2) (Not included in GWP)
183.70
kg CO2/m2
B1-B7
 
Biogenic carbon storage (bio-C) (Not included in GWP)
50.10
kg C/m2
B1-B7
⇒ Advantages of the life cycle assessment outside the system boundary (module D)